Construction & land use · No. 1

Securing a Building Permit

PD 1096 also known as the Building Code of the Philippines has it in Section 301, Building Permit, “No person, firm, or corporation, including any agency or instrumentality of the government shall construct, alter, repair, convert, use, occupy, move, demolish, and add any building/structure or any portion thereof or cause the same to be done, without first obtaining a building permit therefore from the Building Official assigned in the place where the subject building/structure is located pr to be done.” All prescribed application forms (NBC Forms) are available and shall be used by the applicant. The permit becomes null and void if work does not commence within 1 year from the date of such permit, or if the building or work is suspended or abandoned at any time after it has been commenced for a period of 120 days.

Processing time
2 days, 1 hours and 40 minutes
Fees
*Refer to The NEW SCHEDULE OF FEES AND OTHER CHARGES OF THE REVISED IMPLEMEN TING RULES AND REGULATI ONS (IRR) OF THE NATIONAL BUILDING CODE OF THE PHILIPPINE S (PD 1096) Penalties based on seriousnes s of violation
Who may avail
Any authorized individual, corporation, cooperative, etc. who is planning to construct within the Municipality of Pilar
Transaction
G2C · Complex

What to bring

Prepare these before you go.

For Lot Owners and Non-Owners:

  1. Barangay Construction Permit (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Barangay covering the area of construction

  2. Locational Clearance (Notarized) (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Municipal Planning and Development Office

  3. Latest Tax Receipt (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    One-Stop-Shop (Copy of payment of RPT)

  4. Tax Declaration (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Municipal Assessor’s Office

  5. TCT, CLOA or any valid proof of ownership or Deed of Absolute Sale (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Lot Owner, Registry of Deeds

  6. Application forms duly SIGNED & SEALED by a licensed Civil Engineer/Architect, Sanitary Engineer for Sanitary Plans & Electrical Engineer/Registered Electrical Engineer for Electrical Plans. Building plans duly signed and sealed by a licensed Civil Engineer/Architect and properly notarized (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Municipal Engineering Office, Internet Online

  7. Lot plan signed and sealed by Geodetic Engineer (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Geodetic Engineer

  8. Structural design analysis signed and sealed by a Structural Engineer (when warranted) (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Structural Engineer

  9. Bill of Materials and Specification signed and sealed by Civil Engineer/Architect (Notarized) (5 Photocopies + 1 Photocopy if will be used for loan application) 10 10. Reproduced Photocopies of registration number and PTR of Engineers who signed in the plans (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Civil Engineer, Architect Civil Engineer, Architect, Sanitary Engineer, Electrical Engineer, Master Plumber

  10. Long hard brown envelope (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Variety Store

  11. Blueprint of building plans signed and sealed by Civil Engineer/Architect, Sanitary plans signed and sealed by Sanitary Engineer/Civil Engineer/Architect/Master Plumber, Electrical plans signed and sealed by Professional Electrical Engineer/Registered Electrical Engineer (5 Photocopies + 1 Photocopy if will be used for loan application) For Non-Owners: Additional

    Where to get it

    Civil Engineer, Architect

  12. Authorization letter from lot owner/s giving the applicant permission to build and construct on the property or Contract of Lease (5 Photocopies + 1 Photocopy if will be used for loan application)

    Where to get it

    Lot Owner

  13. Photocopy of any valid ID of lot owner/s (5 Photocopies + 1 Photocopy if will be used for loan application) All requirements should be prepared in 5 building official to be assessed as to its with lacking documents. If Zoning Clearance Office) and a Fire Clearance (Bureau of Fire other documents indicated above are required official in 3 Photocopies. To facilitate processing, please take note of other requirements above:

    • Requirements of the National Building
    • Requirements of the Referral Codes [PEC], Revised Plumbing Code, Structural [PSME])
    • Laws and Municipal Ordinances affecting
    • Compliance with BP 344 (Accessibility commercial, institutional and public buildings
    • If setback/yard requirements are not Firewall (strictly no opening) extending up provided. It shall be indicated on the site
    • Grease Traps/Oil Separator shall be provided gasoline stations, auto repair shops,
    • All revisions/additions made in the designer.
    • Special Power of Attorney shall be application forms, plans and documents.
    • All application forms and letters must information available.
    • Forms and Letters, Plans, Specifications, pertinent documents must be signed owner.
    Where to get it

    Lot Owner NOTES: Photocopies and submitted to the office of the completeness. No application shall be processed (from the Municipal Planning and Development Protection) have been secured, the rest of the to be submitted to the office of the building the following before submitting the plans and Code of the Philippines PD 1096 (Architectural Code, Philippine Electrical Code Code [NSCP], Mechanical Engineering Code the design/project Law) shall be indicated in detail on plans for met on the sides and at the back/rear then a to at least 1 meter from the roof level shall be development plan with owner’s conformity. for hotels, restaurants, eateries, terminals, bakeries and other similar establishments. plans shall have an acknowledgement of the provided if the owner is not the signatory in all be properly filled-up with all the necessary Bill of Materials and Cost Estimates and other and sealed by the designer and signed by the

Steps

  1. Submit all the required documents to the Municipal Engineering Office.

    • 1.1 Assess the application.

      15 minutesFee: NoneClerk II Office of the Municipal Engineer
    • 1.2 Send to Mayor’s office for verification and pre-approval.

      1 dayFee: NonePrivate Secretary II Office of the Municipal Mayor
    • 1.3 Inspect the location of the construction. Assess the value of building permit fee and its violation.

      1 dayFee: NoneEngineer II Office of the Municipal Engineer
    • 1.4 Issue the Order of Payment if the application is found to be complete and in order.

      5 minutesFee: NoneClerk II Office of the Municipal Engineer
  2. Proceed to One- Stop-Shop and pay the n ecessary fees.

    • 2. Issue Official Receipt.

      10 minutesFee: *Refer to The NEW SCHEDULE OF FEES AND OTHER CHARGES OF THE REVISED IMPLEMEN TING RULES AND REGULATI ONS (IRR) OF THE NATIONAL BUILDING CODE OF THE PHILIPPINE S (PD 1096) Penalties based on seriousnes s of viola tionClerk II Municipal Treasurer’s Office / One-Stop-Shop Windo w # 2
  3. Receive the approved building permit.

    • 4. Log and release the building permit to applicant.

      10 minutesFee: NoneClerk II Office of the Municipal Engi neer

Where to go

Office of the Municipal Engineer

Municipal Hall, Pilar, Bataan

Office contact

Municipal Hall line: (047) 643-4228

This office has no local number in the municipal office directory.

Municipal office directory

Original text from the Citizen’s Charter
1. Securing a Building Permit
PD 1096 also known as the Building Code of the Philippines has it in Section 301,
Building Permit, “No person, firm, or corporation, including any agency or instrumentality of
the government shall construct, alter, repair, convert, use, occupy, move, demolish, and add
any building/structure or any portion thereof or cause the same to be done, without first
obtaining a building permit therefore from the Building Official assigned in the place where
the subject building/structure is located pr to be done.” All prescribed application forms (NBC
Forms) are available and shall be used by the applicant.
The permit becomes null and void if work does not commence within 1 year from the date of
such permit, or if the building or work is suspended or abandoned at any time after it has been
commenced for a period of 120 days.
Office or Division: Municipal Engineering Office
Classification: Complex
Type of Transaction: G2C – Government to Citizen
Who may avail: Any authorized individual, corporation, cooperative, etc. who is
planning to construct within the Municipality of Pilar
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
For Lot Owners and Non-Owners:
1. Barangay Construction Permit (5 Barangay covering the area of construction
Photocopies + 1 Photocopy if will be used
for loan application)
2. Locational Clearance (Notarized) (5 Municipal Planning and Development Office
Photocopies + 1 Photocopy if will be used
for loan application)
3. Latest Tax Receipt (5 Photocopies + 1 One-Stop-Shop (Copy of payment of RPT)
Photocopy if will be used for loan
application)
4. Tax Declaration (5 Photocopies + 1 Municipal Assessor’s Office
Photocopy if will be used for loan
application)
5. TCT, CLOA or any valid proof of Lot Owner, Registry of Deeds
ownership or Deed of Absolute Sale (5
Photocopies + 1 Photocopy if will be used
for loan application)
6. Application forms duly SIGNED & Municipal Engineering Office, Internet Online
SEALED by a licensed Civil
Engineer/Architect, Sanitary Engineer for
Sanitary Plans & Electrical
Engineer/Registered Electrical Engineer
for Electrical Plans. Building plans duly
signed and sealed by a licensed Civil
Engineer/Architect and properly notarized
(5 Photocopies + 1 Photocopy if will be
used for loan application)
7. Lot plan signed and sealed by Geodetic Geodetic Engineer
Engineer (5 Photocopies + 1 Photocopy if
will be used for loan application)
8. Structural design analysis signed and Structural Engineer
sealed by a Structural Engineer (when
warranted) (5 Photocopies + 1 Photocopy
if will be used for loan application)
9. Bill of Materials and Specification signed Civil Engineer, Architect
and sealed by Civil Engineer/Architect
(Notarized) (5 Photocopies + 1 Photocopy
if will be used for loan application)
10 10. Reproduced Photocopies of Civil Engineer, Architect, Sanitary Engineer,
registration number and PTR of Engineers Electrical Engineer, Master Plumber
who signed in the plans (5 Photocopies +
1 Photocopy if will be used for loan
application)
11. Long hard brown envelope (5 Variety Store
Photocopies + 1 Photocopy if will be used
for loan application)
12. Blueprint of building plans signed and Civil Engineer, Architect
sealed by Civil Engineer/Architect,
Sanitary plans signed and sealed by
Sanitary Engineer/Civil
Engineer/Architect/Master Plumber,
Electrical plans signed and sealed by
Professional Electrical
Engineer/Registered Electrical Engineer (5
Photocopies + 1 Photocopy if will be used
for loan application)
For Non-Owners: Additional
1. Authorization letter from lot owner/s Lot Owner
giving the applicant permission to build
and construct on the property or Contract
of Lease (5 Photocopies + 1 Photocopy if
will be used for loan application)
2. Photocopy of any valid ID of lot owner/s (5 Lot Owner
Photocopies + 1 Photocopy if will be used
for loan application)
NOTES:
All requirements should be prepared in 5 Photocopies and submitted to the office of the
building official to be assessed as to its completeness. No application shall be processed
with lacking documents. If Zoning Clearance (from the Municipal Planning and Development
Office) and a Fire Clearance (Bureau of Fire Protection) have been secured, the rest of the
other documents indicated above are required to be submitted to the office of the building
official in 3 Photocopies.
To facilitate processing, please take note of the following before submitting the plans and
other requirements above:
• Requirements of the National Building Code of the Philippines PD 1096
• Requirements of the Referral Codes (Architectural Code, Philippine Electrical Code
[PEC], Revised Plumbing Code, Structural Code [NSCP], Mechanical Engineering Code
[PSME])
• Laws and Municipal Ordinances affecting the design/project
• Compliance with BP 344 (Accessibility Law) shall be indicated in detail on plans for
commercial, institutional and public buildings
• If setback/yard requirements are not met on the sides and at the back/rear then a
Firewall (strictly no opening) extending up to at least 1 meter from the roof level shall be
provided. It shall be indicated on the site development plan with owner’s conformity.
• Grease Traps/Oil Separator shall be provided for hotels, restaurants, eateries, terminals,
gasoline stations, auto repair shops, bakeries and other similar establishments.
• All revisions/additions made in the plans shall have an acknowledgement of the
designer.
• Special Power of Attorney shall be provided if the owner is not the signatory in all
application forms, plans and documents.
• All application forms and letters must be properly filled-up with all the necessary
information available.
• Forms and Letters, Plans, Specifications, Bill of Materials and Cost Estimates and other
pertinent documents must be signed and sealed by the designer and signed by the
owner.
FEES TO PROCESSING PERSON
CLIENT STEPS AGENCY ACTIONS
BE PAID TIME RESPONSIBLE
1. Submit all the 1.1 Assess the None 15 minutes Clerk II
required documents to application. Office of the
the Municipal Municipal
Engineer
Engineering Office.
1.2 Send to None 1 day Private Secretary
Mayor’s office for II
verification and Office of the
Municipal Mayor
pre-approval.
1.3 Inspect the None 1 day Engineer II
location of the Office of the
construction. Municipal
Engineer
Assess the value
of building permit
fee and its
violation.
1.4 Issue the Order None 5 minutes Clerk II
of Payment if the Office of the
application is Municipal
Engineer
found to be
complete and in
order.
2. Proceed to One- 2. Issue Official *Refer to 10 minutes Clerk II
Stop-Shop and pay the Receipt. The NEW Municipal
n ecessary fees. SCHEDULE Treasurer’s Office
OF FEES / One-Stop-Shop
AND Windo w # 2
OTHER
CHARGES
OF THE
REVISED
IMPLEMEN
TING
RULES
AND
REGULATI
ONS (IRR)
OF THE
NATIONAL
BUILDING
CODE OF
THE
PHILIPPINE
S (PD 1096)
Penalties
based on
seriousnes
s of
viola tion
3. Submit the official 3.1 Engineering None 1 hour Clerk II
receipt to the staff processes the Office of the
Municipal Engineering plans and pertinent Municipal
Engineer
Office. documents for
final approval of
Municipal
the Municipal
Engineer
E ngineer.
Office of the
Municipal
Engineer
4. Receive the 4. Log and release None 10 minutes Clerk II
approved building the building permit Office of the
permit. to applicant. Municipal
Engi neer
TOTAL: *Refer to 2 days, 1
The NEW hours and 40
SCHEDULE minutes
OF FEES
AND
OTHER
CHARGES
OF THE
REVISED
IMPLEMEN
TING
RULES
AND
REGULATI
ONS (IRR)
OF THE
NATIONAL
BUILDING
CODE OF
THE
PHILIPPINE
S (PD 1096)
Penalties
based on
seriousnes
s of
violation